Structurflex delivered a turnkey solution for an outdoor patio and dining area that was covered by an awning and at the end of its life.
Structurflex delivered a turnkey solution for an outdoor patio and dining area that was covered by an awning and at the end of its life. The scope of work included design collaboration with the owner’s in-house design team, complete engineering of the structure and complete installation of the supplied materials and systems.
The structure needed to provide shade and shelter for year-round dining and createan ambience clearly separate from the interior, a dimly lit, more intimate space. It was important to retain certain design characteristics of the interior space. The interior was filled with warm timber elements that helped soften the hard lines of the architecture. Southern yellow pine was used as the primary structural material for the outdoor space. It was complemented with painted white structural connection elements and stainless steel cabling typically used in the sailing industry.
Because the outdoor space fronts the inter-coastal waterway, the structure needed to make a comfortable and seamless transition from the interior dining space to the waterway. This structure met the client’s needs and has become the restaurant’s preferred dining area.
Bringing together several differing building materials—membrane, timber, nautical hardware and structural steel—was a challenge architecturally and structurally. Close attention to detail was critical. In addition, the close proximity of the connection details to the patrons required an exceptionally high degree of craftsmanship.
The structure’s installation had a tight time frame to avoid disrupting the daily business for any extended period of time. Because the structure was completely pre-engineered and fabricated off-site with no requirement for field modification, the structure was completely erected and tensioned in a matter of days. Other traditional systems may have taken weeks to install.
The structure’s installation had a tight time frame to avoid disrupting the daily business for any extended period of time. Because the structure was completely pre-engineered and fabricated off-site with no requirement for field modification, the structure was completely erected and tensioned in a matter of days. Other traditional systems may have taken weeks to install.
The owner is very happy with the project and has considered similar feature structures for other locations
The five-story, 60’s era West Hills Medical Office Building in Los Angeles was due for an exterior facelift. A complete exterior renovation by Michael W. Folonis Architects revealed that water infiltration had caused structural damage to the existing horizontal plaster awnings; removing them was a costly process that consumed much of the project budget. This […]